How Long a Luxury Remodel Really Takes

  • Design and permits come before any demolition
  • Lead times for stone and windows set the pace
  • A dated schedule beats a vague estimate

Design

Drawings, selections and approvals take weeks. Rushing them costs more later, when changes are made on site.

Permits and ordering

While the building department reviews drawings, stone, windows and cabinetry are ordered. The longest lead time often decides the start date.

Construction

Demolition, framing, rough-in, inspections, finishes and installation follow in sequence, and each trade needs a clear window.

Ask for dates

A good schedule names the weeks each phase starts and ends and which decisions are due before then.

Related

Questions about your project? Call (800) 224-9245 or use the form below to book a design consultation.

Design consultation

Tell us about your home. We will take it from there.

Send the form and a real person will reach out to set up a design consultation. We walk the house, listen to how you live and send a written plan, a schedule and a budget range, with no pressure to book.

  • A walk around the whole house, with photos
  • Moisture checks at the trouble spots
  • A written plan you can keep, whoever you hire

Prefer to talk? Call (800) 224-9245

Book a design consultation

It takes a minute. A real person reads every request.

We use your details only to answer your message. Read the privacy policy.