How Long a Luxury Remodel Really Takes
- Design and permits come before any demolition
- Lead times for stone and windows set the pace
- A dated schedule beats a vague estimate
Design
Drawings, selections and approvals take weeks. Rushing them costs more later, when changes are made on site.
Permits and ordering
While the building department reviews drawings, stone, windows and cabinetry are ordered. The longest lead time often decides the start date.
Construction
Demolition, framing, rough-in, inspections, finishes and installation follow in sequence, and each trade needs a clear window.
Ask for dates
A good schedule names the weeks each phase starts and ends and which decisions are due before then.