Remodel Timeline Estimator: Design, Permits, Lead Times and Build
Pick a room, its size and the finish level, then set permit weeks and the longest lead time to see weeks of design, waiting and construction and an estimated move-in date.

About the timeline estimator tool
Pick a room, its size and the finish level, then set the permit weeks and the longest lead time. Construction weeks are the base weeks for the room times the size ratio to the power 0.6 times the finish factor. Waiting is the longer of the permit weeks and the lead time, because ordering happens while the permit is reviewed.
These tools give planning estimates from the numbers you type. Real projects depend on the house, the materials and a site visit, so use the results as a starting point and book a design consultation for a written plan.