Remodel Timeline Estimator: Design, Permits, Lead Times and Build

Pick a room, its size and the finish level, then set permit weeks and the longest lead time to see weeks of design, waiting and construction and an estimated move-in date.

A tape measure and plans over a sample board of marble and brass
How it works

About the timeline estimator tool

Pick a room, its size and the finish level, then set the permit weeks and the longest lead time. Construction weeks are the base weeks for the room times the size ratio to the power 0.6 times the finish factor. Waiting is the longer of the permit weeks and the lead time, because ordering happens while the permit is reviewed.

These tools give planning estimates from the numbers you type. Real projects depend on the house, the materials and a site visit, so use the results as a starting point and book a design consultation for a written plan.

Ready to plan a home you will love for decades?

Book a design consultation. We walk the house, listen to how you live and send a written plan, a schedule and a budget range.

Design consultation

Tell us about your home. We will take it from there.

Send the form and a real person will reach out to set up a design consultation. We walk the house, listen to how you live and send a written plan, a schedule and a budget range, with no pressure to book.

  • A walk around the whole house, with photos
  • Moisture checks at the trouble spots
  • A written plan you can keep, whoever you hire

Prefer to talk? Call (800) 224-9245

Book a design consultation

It takes a minute. A real person reads every request.

We use your details only to answer your message. Read the privacy policy.